2015 |
PETRONAS CHEMICALS MTBE (PDH) SDN BHD |
SUPPLY OF MANPOWER, EQUIPMENT & CONSUMABLE FOR HYDRAULIC TORQUE WRENCH WORK AT REACTOR AREA PDH PLANT |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
RECTIFY LEAK / REPAIR SHELL CRACK AT EB 201 A MTBE PLANT |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO RECTIFY LEAK AT EB224 FOR MTBE PLANT |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO RECTIFY LEAK D 218 AT MTBE PLANT |
2015 |
DAYA PROFFSCORP SDN BHD |
REPLACE CONE SECTION & PERFORM TIBE LEAK TEST AT EA 227 A (BUNDLE NO. 9) MTBE PLANT |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
SUPPLY OF MATERIAL FOR MTBE SD JAN 2015 |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
HTW FOR CRITICAL JOINT INSPECTION |
2015 |
DAYA PROFFSCORP SDN BHD |
EXCAVATION WORK FOR FOAM LINE INSPECTION AT MTBE PLANT |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
LIFTING EQUIPMENT REVALIDATION-01 (MTBE) |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
GUILLOTINE DOOR REPAIR WORKS AT B1004 |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO PERFORM LEAK TEST & REPAIR WORKS AT EB-232 |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO RECTIFY UNDERGROUND FIREWATER LINE LEAK AT PCMTBE NEAR TANK T1101 B |
2015 |
ZULKIFLI NGAH ENGINEERING SDN BHD |
SUPPLY OF PTFE LINED PIPE FOR PC702A&B AND D1107 |
2015 |
PCG, OPTIMAL CHEMICALS PLANT |
TO PROVIDE REPAIR WORKS FOR SECONDARY QUENCH EXCHANGER E1322 |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO SERVICE PSV FOR MTBE |
2015 |
PETRONAS CHEMICALS MTBE SDN BHD |
SERVICE PRESSURE SAFETY VALVE ¾ (S/N 91/08205 & S/N 620820093) |
2015 |
PETRONAS CHEMICALS MTBE (PDH) SDN BHD |
CRITICAL JOINT INSPECTION AND RETIGHTENING PROJECT |
2015 |
PETRONAS CHEMICALS MTBE (PDH) SDN BHD |
SERVICE PRESSURE SAFETY VALVE 1 ½” X 2” (S/N PB16273) |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO PERFORM BOX UP & DEBLINDING WORKS FOR EA-117 |
2014 |
CENTRALISED UTILITY FACILITIES, KERTEH |
REPLACE PIPE SPOOL AT COLD BOX AREA AT CUF KERTEH |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO FABRICATE PIPE SUPPORT FOR 3" PIPE C/W U-BOLT |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
F-102 ROOF FABRICATE |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
F-102 HEARTH BURNER REPAIR |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
12" X 150# BUTTERFLY VALVE, EXTEND BONNET |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
PLATE SHEET, SS304, 8FT X 4FT X 45MM THK |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO FABRICATE POONTON AND PERFORM LEAK TEST |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO FABRICATE NUT PLUG AS PER SAMPLE BUT IN MATERIAL SS304 |
2014 |
CENTRALISED UTILITY FACILITIES, KERTEH |
EMERGENT WORK AT HRSG-F STEAM BOILER REPAIR |
2014 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR V-130 CONDENSATES DRAIN LINE. (MYLR) & WH-A13-INLET & OUTLET/ WH-A17 |
2014 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR V-110 CHEMICAL INJECTION POINT LEAKING, BYPASS HEADER MODIFICATION 14", SDV/XY 253B EQUALIZING. (MYTP) & OD CAISSON WILDEN PUMP. (MYSH) |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO FABRICATE TEST RING FOR KC-201 TEST RING |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATE BLIND FLANGE 2” X 150# A105 |
2014 |
CENTRALISED UTILITY FACILITIES, KERTEH |
REPLACE UPVC PIPE SPOOL AT DEMIN WATER PLANT |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO REPLACE FLANGE FOR TUBE SIDE EB-0704. |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
REPLACE UNDERGROUND FIREWATER LINE AT AREA 400 |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO FABRICATE 1-1/2" PTFE LINED |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO REPAIR/ FABRICATE LOADING LINE AT T-201 |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
STEAM HEADER MODIFICATION |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
HOT WORK FOR IPF PROJECT |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
BOLT CHECKING AND TIGHTENING USING HTW MACHINE |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET TOP ROOF REPLACEMENT PROJECT |
2014 |
CENTRALISED UTILITY FACILITIES, KERTEH |
PROJECT PTFE UPVC PIPE FLANGE CRACK COOLING WATER ACID LINE |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
MTBETA14: C0103 FABRICATE MONEL SLEEVE |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
MTBETA14: TO FABRICATE PTFE LINED CS |
2014 |
NEWWIN ENGINEERING PAKA SDN BHD/ PETRONAS CHEMICALS MTBE SDN BHD |
TO PERFORM MECHANICAL AND RIGGING WORKS AT R-301B AREA 300 |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
LIFTING EQUIPMENT REVALIDATION - 3 |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
SUPPLY OF MANPOWER, EQUIPMENT & CONSUMABLE FOR HYDRAULIC TORQUE WRENCH WORK AT MTBE PLANT |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
MTBETA14:EB-0703.1 FABRICATE NEW FLANGE |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
REPLACEMENT OF 3 NOS OF HEATER TUBE |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
SPRING HANGER REPLACEMENT |
2014 |
CENTRALISED UTILITY FACILITIES, KERTEH |
FABRICATE, INSTALL & REMOVE TEMPORARY PIPE SPOOL FOR BLOWING ACTIVITIES AT ASU 2 PLANT CUF, KERTEH |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
FABRICATION OF COOPER TIN BAR |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
LIFTING EQUIPMENT REVALIDATION - 2 |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
NOZZLE FLANGE RESURFACING 4" X 300# |
2014 |
CENTRALISED UTILITY FACILITIES, KERTEH |
TO REPLACE COOLING WATER ACID LINE |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
CATALYST TRANSFER PIPE REPLACEMENT AT OLEFLEX REACTOR 1,2,3 |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
TO SUPPLY FLEXIBLE HOSE 1” AT ETHYLENE |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
SPRING HANGER REPLACEMENT & INSTALLATION FOR CH07, CH08, CH09 & CH10 |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
EA-227 & CLEAN FLARING PIPING TIE-IN PROJECT |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO INSTALL NEW TIE-IN FOR LEMON GRASS PROJECT AT PORT STORAGE |
2014 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
LIFTING EQUIPMENT REVALIDATION |
2014 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR BYPASS ATM VENT LINE. (MYGA) |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
PIPING & INSTRUMENTATION UPGRADE WORK FOR MTBE PLANT |
2014 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO REPLACE T04 FRP TANK |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
EMERGENT WORK LP STEAM HEADER (REPAIR PIPE & INSTALL TEMPORARY SUPPORT & TO FABRICATE TEMPORARY DRAIN LINE AT STEAM HEADER) |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR V-875 2" PIPING FROM PSV-875 TO 18" VENT HEADER CORRODED. (MYJA), TO FABRICATE SPOOL FOR A-15L, SLOT-7 OP FLOWLINE. (MYUA) & TO FABRICATE SPOOL FOR H-04, SLOT-10 GAS LIFT FLOWLINE. (MYSH) |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
AIR FILTER MODIFICATION |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO FABRICATE S-107 TO INSTALL THE COOLING COIL |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
URGENT WORK |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
HYDRAULIC BOLT TENSIONING & BOLT TORQUING |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
FIN BURNER 2 PCS REPAIR |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
VALVE, GA, TH, MSS MATERIAL SP80, 1" NPTF, CL150, BRZ |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
FLANGE, BL, 14", 300#, MATERIAL A105N, RF, B16.5 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
ELBOW, BW, 8", 30, WPB MATERIAL, 90 DEG., LR, SMLS |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
PIPE SPOOL MODIFICATION OF FE-2784 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
TEE, EQ., BW, 2.1/2", 40, MATERIAL CS, SMLS |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
GASKET, SW, 32" 150, B, MATERIAL 316L, GRP, 316L, CS |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
EMERGENT WORK |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
EMERGENT WORK INSTRUMENT |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
BLIND, SPADE, 2" 150#, 6MM, CS, FF, B16, 5 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATE END CAP FOR PSV-6072 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATE INTERNAL FLANGE, 2" NB SCH. 105 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO FABRICATE PLUG TUBE |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATE PLUG TUBE OD 8MM X 12MM X 18MM |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO FABRICATE INSPECTION WINDOW CHANGE HEATER |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATE PUZZLE PLATE FTISSENER |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATE PLUG TUBE OD 8MM X 12MM X 18MM, B7 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
36" X 300/600# SOCW FLANGE SCH. 80 RFFE ASTM A105 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATE EXCHANGE PLUG 15MM, B7 10PCS & NIPPLE 1/2", 100MM(L) THREAD, B7 30 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
BLIND, SPADE, 14" 300#, 10MM, CS, FF, B16,5 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
PDHTA2013-SO1Z130006, TO FABRICATE INSULATION CLIP (SAMPLE A - 200 PCS) (SAMPLE B - 200 PCS) |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
FLANGE, BL, 3", 300#, A105N, RF, B16.5 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
PIPE, 22", 30, 5L-B, SMLS, BE |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
FLANGE, BL, 3", 300#, A105N, RF, B16.5 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
SHEET, SS304, 2438 X 1219MM, 10MM |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
PDHTA2013-SO1A1300021 TO FABRICATE COLLAR RING FOR R X 1,2,3,4 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
PDHTA2013-SO1A1300022 TO FABRICATE TEST FLANGE C/W NIPPLE 3/4" X 300#, A105 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
PDHTA2013-SO2B130010 (MRF1614), TO FABRICATION INSULATION CLIP |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
PDHTA2013-SO2A130023 (MRF1632), TO FABRICATION INSULATION CLIP |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
RE-GASKET @ HP/IP B BYPASS LINE |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
DRAIN VALVE ELBOW NEAR SPV-105-5 |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
BLINDING JOBS FOR HRSGF PRESERVATION |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
HYDRAULIC TORQUE WRENCH (HTW) |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
HTW STEAM LINE |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
REMOVE & INSTALL CONTROL VALVE |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
BLIND/ DEBLIND USING HTW |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
MECHANICAL WORK @ COGEN |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
RECTIFY LEAK @ PAC INJECTION LINE. REPLACE CPVC PIPE L/S |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
VO TO PERFORM RECTIFICATION LEAK & FLANGE SURFACE FOR PRESSURE VESSEL OF REACTIVATION HEATER AT ASU 2 PLANT |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-P151AX CASING FABRICATION THREAD REPAIR |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
LEVEL GAUGE COVER RESURFACE 2ND BATCH |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
SIGHT GLASS COVER RESURFACE |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
IP/LP LETDOWN C 8" X 600# FLANGE RE-SURFACE |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
TO BUILD JUMPER LINE AT HP GAN |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
10"X 2500# HRSG C BLINDING DEBLINDING |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
HP/IP LETDOWN STATION VALVE LEAK |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
HHP STEAM LETDOWN BLINDING DEBLINDING |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
E116 3/4" VALVE & E004AB 4" ELBOW REPLACEMENT |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
BURNER STAGE NOZZLE REPAIR THREAD (6 PCS) |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-F-103AB PTLE TUBE PLUGGING |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-F-101AB PTLE TUBE PLUGGING |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-F-101AB PTLE TUBE PLUGGING |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-F-101AB PTLE TUBE PLUGGING |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
HYDRAULIC JACK VESSEL AT POLYETHYLENE |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
REPLACEMENT SEAL PLATE AFTER COOLER AT CUF, GEBENG PLANT |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
REPLACEMENT OF VALVE 3/4" X 800# CONTINUOUS GAS LEAK |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
HOT BOLTING WORKS AT MTBE REACTOR AREA |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR P-858-B/P-863, 3" CAISSON PUMP COLUMN CORRODED, P-803A/B COMAN DRAIN LINE LEAK, TR-A, TR-B & TR-C HPC/LPC DRAIN PIPING CORRODED MANUAL CASE. (MYJA) |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
LIFTING EQUIPMENT REVALIDATION |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR IGF-462 DISCHARGE LINE CLOGGED. (MYGA) |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
HRSG-B REPLACE LEAK 3" ELBOW AT 121Q1CA-1B5B-CV BLOW DOWN LINE 1" COGEN PLANT CUF, KERTEH |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
HRSG-F DEBLINDING WORK 10" X 2500# AT ASU 2 PLANT, KERTEH |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATION & INSTALLATION OF ENCLOSURE FOR D-1004 ELBOW LEAK AT PCMTBESB PLANT |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
SPRING HANGER INSTALLATION AT ETHYLENE PLANT, KERTEH |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
ENGINEERING, FABRICATION, INSPECTION, TESTING AND DELIVERY OF AIR FINNED COOLER HEAT EXCHANGER FOR PC MTBE TA 2014 ("WORKS") - SMSO/PCMTBE/2013/0152 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
ENGINEERING, FABRICATION, INSPECTION, TESTING AND DELIVERY OF AIR FINNED COOLER HEAT EXCHANGER (EA 227.1) FOR PC MTBE TA 2014 ("WORKS") - SMSO/PCMTBE/2013/0152(2) |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
TO PERFORM SERVICE AND CLEANING AFTER COOLER AT NGU2 |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
LP/LP LETDOWN BLINDING, DEBLINDING & REMOVE AND INSTALL 3 WAY CONTROL VALVE |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR 8" WITH 1" ARMORWRAP AT LAA PROD DECK M-4 (MYLA), 1" CORR'D DIESEL LINE TG610 (MYLA), AIR LINE LEAKING 1" MOD#2 (MYTC), OVERHEAD DISCHARGE LINE BADLY VIBRATES (MYTC), DISCHARGE LINE PARTED (MYTE), 1" MAIN LINE INST AIR PIN HOLE LEAK (MYMB), 1" VENT BADLY CORRODED (MYMA), 4" PINHOLE LEAKING FROM FT671 (MYMA), V-610A 2" DRAIN LINE BADLY CORRODED (MYMA), GAS LIFT TEST HEADER MANIFOLD CORRODED (MYMA), WELLHEAD B3 FLOWLINE & VALVE CORRODED (MYMB), SEA WATER LIFT PUMP (MYMA), B-18U OP FLOWLINE (MYGB), B-22U FLOWLINE W/INJECTION (MYGB), A-14L OP FLOWLINE (MYUA) & SPADE 16" X 600#RF FOR V-303 ANGSI LINE. (MYTP) |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
RECTIFY LEAK FLANGE 10 X 2500 & REPLACE STUD BOLT AT COMPRESSOR HOUSE ASU 2 PLANT |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
TO PERFORM REPAIR EGF FIN BURNER |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
SUPPLY OF FIRE WATCHER AT CUF, KERTEH |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
TO PERFORM WORK FOR ADDITIONAL H-BEAM AT COGEN AREA & TO PERFORM REPAIRING DRAINING SPOOL AT NGU2 |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
HEAT EXCHANGER SUPPORT MODIFICATION AT CUF, GEBENG |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
TO REPLACE CONCENTRIC REDUCER 1" X 1/2" AT ET-0-F-106, ET-0-PG-106-16D |
2013 |
SERI DINAMIK ENGINEERING SDN BHD |
DESIGN & FABRICATE HYDROTEST FLANGE |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
ENCLOSURE PANEL SURVEY AND TO FABRICATE & SUPPLY ENCLOSURE |
2013 |
HYUNDAI ENGINEERING/ PETRONAS GAS BERHAD |
PRR2 PIPING ERECTION PROJECT |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-F-102 FURNACE TOP ROOF FABRICATION |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-F-103 TO REPAIR BURNER CASING WORK |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
BFWP RECYCLE LINE UNIT C ELBOW REPLACEMENT |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
TO PERFORM RECTIFICATION LEAK AND FLANGE RE-SURFACE FOR PRESSURE VESSEL OF REACTIVATION HEATER AT ASU 2 PLANT, CUF KERTEH |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
3" 150# PUMP ADAPTER |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
EB-234 REPLACEMENT PROJECT AT MTBE PLANT |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-F-101-105 BURNER COVER REPAIR WORK |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-F-106 FURNACE TOP ROOF FABRICATION |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR PV-150C REDUCER. (MYGD), PSV-288A/B WALL LOST AT VENT LINE, TR-A GG LUBE OIL COOLER. (MYJA) & V-230 BRIDLE AUTO DRAIN LINE. (MYLA) |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
FABRICATION OF 2 SET FURNACE TOP ROOF |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
RECTIFICATION OF FIREWATER LINE LEAK AT PDH, PLANT (GRE PIPE) |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
TO PERFORM SERVICING WORK AND CLEANING AFTER COOLER, AIR COOLER AND CONDENSOR |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
C-701 REPLACEMENT AT MTBE PLANT, GEBENG |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
TO BUILD JUMPER LINE FROM HP GAN TO EOG LINE AT CUF, KERTEH |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
FABRICATE HANGER PLATE TV-507A ACTUATOR |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
REPLACEMENT 2" PIPE SPOOL FOR LINE TANK 5% H2SO4 AT DEMIN BUILDING AREA CUF, GEBENG |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
1/2" AIR DRYER LINE AT SI-242AB01 A/B/C/D & SI-242A01 A/B/C/D AT CUF, KERTEH |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
TO BUILD REDUNDANT LINE FOR SERVICE GAN AND BACK UP INSTRUMENT AIR AT CUF, KERTEH |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
RECTIFICATION OF SIDE STREAM FILTER AT CUF, GEBENG PLANT |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR A50-A6-62 NEW LINE, LEAKING DRAIN HEADER, 6" VENT AT ME-810, AIR RECEIVER 520 & 526. (MYSA) |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR TWIN AGENT AT EAS & V-250 4" INLET GA |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
MECHANICAL AND PLANT DEFECT RECTIFICATION WORKS DURING PCMTBESB PLANT SHUTDOWN IN MAY 2013 |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATION SPOOL FOR A-25 & A-05 GL FLOWLINE REPLACE. (MYIA) |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO PERFORM TAPPING, CUTTING & WELDING WORKS AT E-2004/ E-2005 PIPING |
2013 |
TRANSWATER API SDN. BHD |
FABRICATION OF TEMPORARY SPOOL FOR PCV-504 |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
REPLACE 3" CS SPOOL BFW LINE |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR A-18 OP, A-7L OP, A-10 GL, A-15 GL FLOWLINE REPLACEMENT. (MYIA) & V-610 PRESSURE GAUGE WELDMENT. (MYMA) |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
REPLACE 3" API 5LB SPOOL AT DEMIN PAC LINE (GRE) AT CUF, GEBENG PLANT |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
CORRODED HEADER @ PCV-200 & CHANGE OUT CLOGGED HP DRAIN HEADER LINE |
2013 |
EPIC MUSHTARI ENGINEERING SDN. BHD/ PETRONAS CHEMICALS MTBE SDN BHD |
REACTOR OVERHAUL WORK AT PDH PLANT, GEBENG |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-PT-404 PIN HOLE LEAK |
2013 |
CENTRALISED UTILITY FACILITIES, KERTEH |
REPAIR CRACK AT COLD BOX ASU-2 AT CUF, KERTEH |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
ET-0-F-105 TOP ROOF REPAIR |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR M-1 INSTRUMENT AIR LEAK. (MYIA) |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
LATE WORK REQUEST FOR PDH PLANT TA 2013 |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR B-13L (MYGB) & A-17U (MYGA) FLOWLINE LEAK |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR B-17U WI F/LINE PIN HOLE LEAK, B-20U W/INJ F/LINE. (MYGB) & A-11U W/INJ F/LINE. (MYGA) |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
PIPING REPLACEMENT WORK AT JETTY KERTEH PORT |
2013 |
EPIC MUSHTARI ENGINEERING SDN BHD/ PETRONAS CHEMICALS MTBE SDN BHD |
WELDING 8 NOS OF HEATER TUBE AND 10 NOS OF SKIN THERMOCOUPLE |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
SUPPLY OF PIPES & FITTINGS FOR E-3005 PIPING MODIFICATION |
2013 |
CENTRALISED UTILITY FACILITIES, GEBENG |
DEFECT RECTIFICATION WORK DURING ZERO STEAM APRIL 2013 AT CUF, GEBENG |
2013 |
EPIC MUSHTARI ENGINEERING SDN BHD/ PETRONAS CHEMICALS MTBE SDN BHD |
DEFECT RECTIFICATION WORK AT CCR & REACTOR AREA PDH, PLANT |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR P-625B FLANGE SPOOL, LRA A-24 FWS F/LINE EQUAL AND LRA V-610 3" LINE LOG. (MYLR) |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR PALAS GASLIFT PIPING. (MYPA) & THERMOCOUPLE TAPPING FLANGE. (MYMA) |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
HTW WORK FOR CHECKING CRITICAL JOINT & BOLT TENSIONING BOTTOM CONE CCR SCREEN |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
UT-0-A-521 EGF FIN BURNER REPAIR |
2013 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE WELLBAY SECONDARY BEAM REPAIR. (MYTD) & TO FABRICATE SPOOL FOR PCV-206 D/S LEAKING VALVE. (MYIA) |
2013 |
PETRONAS CHEMICALS ETHYLENE SDN BHD |
REPLACE PIPING ET-0-F-105 NEAR SPV-105-5 |
2013 |
M3NERGY JDA SDN BHD |
SUPPLY AND FABRICATE PIPE SPOOL (FLANGE TO FLANGE REPLACEMENT AT RATU SONGKHLA) |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO REPLACE NOZZLE T1 (36"X300#) AT E-2001A/B DURING PDH PLANT TA-2013 |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
EMERGENT REPAIR WORK AT D-1402 AREA 200 AND U-1403 AREA 600 MTBE, PLANT |
2013 |
PETRONAS CHEMICALS MTBE SDN BHD |
EMERGENT WORK TO PERFORM REMOVAL, CLEANING, REPAIR AND INSTALLATION OF CCR SCREEN R-701 AT MTBE, PLANT |
2012 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO FABRICATE & INSTALL ANTENNA MOUNT SUPPORT |
2012 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
FABRICATION WORKS FOR WATER INJECTION SYSTEM |
2012 |
CENTRALISED UTILITY FACILITIES, KERTEH |
TO REMOVE & RE-INSTALL CONTROL VALVE AT COGEN PLANT, CUF KERTEH |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
EMERGENT WORK - FIREWATER LEAK AT MTBE, PLANT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
PCC OF RED BYPASS, RTD V-2023 PROJECT & TIE IN OF PROPYLENE UNLOADING FACILITIES |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
R-301A IN-SITU CLEANING PHASE 4 |
2012 |
CENTRALISED UTILITY FACILITIES, KERTEH |
TO PERFORM REPLACEMENT WORK FOR IA AND N2 PIPE LINE AT COLD BOX AREA, ASU 2 PLANT, CUF KERTEH, KEMAMAN, TERENGGANU (PHASE 3) |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
REPAIR CRACK E-2001B AT PDH, PLANT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO OPEN AND CLEANING R-301B MAIN MTBE REACTOR - PHASE III |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO REPAIR VGS NOZZLE AT PDH, PLANT |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE FOR IBC C-14, C-15 & C-12 GL FLOWLINE IWS. (MYIC) |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
HYDROTEST WORK IC4 LINE FROM MTBE TO CRYOVAC |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
DED WORKS FOR THE DUAL ZONE BURNING FOR PDH REGENERATION TOWER |
2012 |
CENTRALISED UTILITY FACILITIES, KERTEH |
TO PERFORM REPLACEMENT WORK FOR IA AND N2 PIPE LINE UNDER LIN/LOX TANK |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
C-701 MIDDLE SECTION REPLACEMENT AT MTBE, PLANT |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR SRA-4 GAS LIFT F/LINE. (MYSR), SRA-1 F/LINE PROD. (MYSR), SDV-150A FLANGE. (MYSA), V-250 WATER OUTLET PIPING. (MYGA) |
2012 |
CENTRALISED UTILITY FACILITIES, GEBENG |
REPAIR E2-251B42 AIR COOLER |
2012 |
CENTRALISED UTILITY FACILITIES, KERTEH |
4A905 & 4A906 NEW BYPASS LINE |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATION & INTERNAL COATING FOR SMALL VESSEL AT PDH, PLANT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
R-4902 VESSEL CLEANING & REPAIR AT NOZZLE (2C) STAGE 3 |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
JEA/ PSR/ 062, 059, 051, 050 & 066 SPOOL REPLACEMENT AT F-435 JERNEH-A |
2012 |
ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN BHD |
TF-0-E-002 BOG PIPING REPLACEMENT |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR G-18 FLOWLINE REPLACEMENT. (MYSG) |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
C-701 PARTIAL SHELL REPLACEMENT |
2012 |
CENTRALISED UTILITY FACILITIES, KERTEH |
4A905 PCV BYPASS LINE AT CUF, KERTEH |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO OPEN AND CLEANING R-301B MAIN MTBE REACTOR - PHASE II |
2012 |
ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN BHD |
ET-0V-104 (SC-104-4) WELDING VALVE 1/2" & SAMPLE COOLER COIL |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
STEAM TRAP PIPE SPOOL RECTIFICATION PROJECT |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR V-422 CORR'D PIPING. (MYSA), TO FABRICATE SPOOL FOR A-20L. (MYGA), B-5L. (MYGB), B-14L. (MYGB) & A-21U. (MYUA) FLOWLINE (IWS) |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
RECOVERING DRAINING BFW TO D-1007 AT MTBE, PLANT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
F-302B FILTER REPLACEMENT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO OPEN AND CLEANING R-301A MAIN MTBE REACTOR |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
INSITU HYDROJETTING CLEANING FOR R-301A |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE GRAYLOC HUB PUP PIECE, 3"S160, A105N. (MYGA), (MYPA) & (MYUA) |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO RECTIFY LEAK AT E-3005 A & B |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
INTERNAL COATING FOR P-2003 COOLER |
2012 |
CENTRALISED UTILITY FACILITIES, GEBENG |
TO MAKE GOOD MRO-D, DEMIN PLANT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO REPLACE FIRE WATER LEAK PIPING AT PDH, PLANT (PHASE II) |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO OPEN AND CLEANING R-301B MAIN MTBE REACTOR |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR A-14L FLOWLINE REPLACEMENT. (MYTA), TO FABRICATE SPOOL FOR PSV-895 BY PASS LINE. (MYSA) |
2012 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
PRODUCED WATER TREATMENT CAPACITY UPGRADED PROJECT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO RECTIFY LEAK AT E-4903 PDH, PLANT |
2012 |
ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN BHD |
TO SERVICE CHAIN BLOCK (OVERHEAD CRANE) |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
V-110 BRIDGE SPOOL REPLACEMENT (MYTA) |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO REPAIR OF FIRE PROOFING AT AREA-200 MTBE, PLANT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
CCR EMERGENCY SHUTDOWN JUNE 2012 AT MTBE, PLANT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO REPLACE STRUCTURE AT EA-1703 A/B AT PORT STORAGE, PLANT |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE CORRODED GRATING AT PRODUCTION DECK (MYLR) |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO REPLACE PVC PIPE, FITTINGS & STRAINER AT PC1407 |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO REPLACE PIPING AT PC-1409A AT AREA-400 MTBE, PLANT |
2012 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
PERINTIS SHUTDOWN JUNE 2012 |
2012 |
FPSO VENTURES SDN BHD |
CHEMICAL INJECTION PIPE SPOOL MODIFICATION AT FPSO BUNGA KERTAS |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATE & INSTALL SPOOL & BALL VALVE AT Z-1001 MTBE, PLANT |
2012 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO FABRICATE NEW STEEL PIPE FOR DELUGE & FOAM HEADER |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATION & INSTALLATION OF CONDENSATE DRAIN LINE PIPING AT E-3005 PDH, PLANT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
PPM MINI SHUTDOWN APRIL 2012 |
2012 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
MANPOWER FOR RIGGING DURING UWILD |
2012 |
ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN BHD |
LIFTING EQUIPMENT REVALIDATION (002) |
2012 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO FABRICATE NEW 16" SPOOL STEEL FOR HT COOLER PIPE LINE LOWER PLATFORM IN ENGINE ROOM |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE SPOOL FOR PCP A-05/A-12 & A-15 (MYTA), A-19U (MYTA), F-11 GL (MYSF) AND F-24 GL (MYSF) F/LINE REPLACEMENT |
2012 |
CENTRALISED UTILITY FACILITIES, GEBENG |
TO PERFORM AIR COOLER TUBE PLUGGING AT CUF, GEBENG |
2012 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
6" CRUDE LINE REPLACEMENT |
2012 |
CENTRALISED UTILITY FACILITIES, KERTEH |
MOC LP GAN PIPELINE ASU-2 |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO REPLACE B-7L, B-7U, B-5L & B-5U AT MYMB PLATFORM |
2012 |
CENTRALISED UTILITY FACILITIES, GEBENG |
TO PERFORM BELLOW REPLACEMENT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO PERFORM BLASTING ON TX-1 INNER SCREEN (LCP) AT PDH PLANT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
SUPPLY & INSTALL STEAM TRACING AT EB-234 AREA 200 |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
RECTIFY FIRE WATER LEAK AT PDH PLANT |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
RECTIFICATION OF DEFECT ITEMS DURING MTBE PLANT SHUTDOWN 2012 |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TO FABRICATE STEEL BOX AND TEMPORARY HOSE FOR J701 |
2012 |
ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN BHD |
HOSE TESTING REVALIDATION (002) |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
FABRICATION & INSTALLATION OF PIPING FOR NEW ALFA LAVAL (HEAT EXCHANGER) UNIT |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE GRATING FOR CELLAR DECK PLATFORM (MYGD) |
2012 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE 2” PIPE SPOOL FOR EQUALIZATION NORTH AND SOUTH HEADER (MYGD) |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
LOADING & UNLOADING RASCHING RING AT C-103 |
2012 |
CENTRALISED UTILITY FACILITIES, KERTEH |
FABRICATION & INSTALLATION OF LOT VAPORIZER PIPING |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
2” LINE FOR CONDENSATE DRAIN OUTLET AT AREA 300 |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
TEMPORARY PVC LINE TO FURTURE 300 |
2012 |
PETRONAS CHEMICALS MTBE SDN BHD |
2” METHANOL LINE FOR TRUCK LOADING |
2011 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
INSTALLATION OF NEW VSAT ANTENNA AT FPSO PERINTIS |
2011 |
CENTRALISED UTILITY FACILITIES, KERTEH |
STRUCTURE REPAIR WORKS FOR CLARIFIER B AT CUF, KERTEH |
2011 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
1-1/2" BYPASS AT V-522 (MYJA), GENERATOR FUEL GAS (MYTD) & PUMP P-120B CASING DRAIN VALVE (MYTP) - FABRICATION WORKS |
2011 |
MTBE (M) SDN BHD |
PO 3 TO PO 4 CPVC LINE REPLACEMENT |
2011 |
MTBE (M) SDN BHD |
PPM REACTOR WORKS - OPEN & CLEANING |
2011 |
MTBE (M) SDN BHD |
HEAT TRACING FOR HEVIES BUNKER PIPING |
2011 |
MTBE (M) SDN BHD |
EB-215 FLANGE REFURBISHMENT |
2011 |
MTBE (M) SDN BHD |
FABRICATION & INSTALLATION OF HEVIES BUNKER PIPING |
2011 |
EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
TO FABRICATE PIPE SPOOL FOR DRAIN LINE HEADER LEAK (MYIA) - EXXONMOBIL |
2011 |
MTBE (M) SDN BHD |
RECTIFICATION WORK FOR FIRE WATER LINE LEAK |
2011 |
POLYPLASTICS ASIA PACIFIC SDN BHD |
HEAT SOURCE EXCHANGE FROM LS TO LLS FOR H.2601, H.2701, H.2801 & H.3801 |
2011 |
MTBE (M) SDN BHD |
FLANGE BUILD UP & RE-FACING THE REGENERATION HEATER EB-0215 |
2011 |
MTBE (M) SDN BHD |
RE-TUBING WORKS FOR U1201B AIR COOLER |
2011 |
MTBE (M) SDN BHD |
STEAM TRAP INSTALLATION AT PDH |
2011 |
MTBE (M) SDN BHD |
REMOVE HEATER PLUG AT F-2002 |
2011 |
CENTRALISED UTILITY FACILITIES, GEBENG |
TO REPAIR FLANGE LEAK AT UNIT A DEARATOR HEAD AND VESSEL |
2011 |
MTBE (M) SDN BHD |
PDH STEAM ISOLATION VALVE REPLACEMENT |
2011 |
MTBE (M) SDN BHD |
INSTRUMENT AIR PIPING MIGRATION AND NEW N2 HEADER AT PORT STORAGE |
2011 |
MTBE (M) SDN BHD |
MECHANICAL AND PLANT DEFECT RECTIFICATION WORKS DURING MMSB/PPMSB PLANT AND PORT STORAGE SHUTDOWN APRIL 2011 (PHASE III) |
2011 |
MTBE (M) SDN BHD |
PIPING WORKS FOR DIB BOTTOM PROJECT |
2011 |
MTBE (M) SDN BHD |
EB112 & EB114 BUNDLE REPLACEMENT |
2011 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
PERINTIS SHUTDOWN 2011 |
2011 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
GAS COMPRESSOR COOLING WATER LINE AND CRACKED PIPE SPOOL MCSW PUMP IN ENGINE ROOM |
2011 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
SUPPLY OF MANPOWER – M3NERGY |
2011 |
MTBE (M) SDN BHD |
RX1 INNER AND OUTER SCREEN MODIFICATION |
2011 |
MTBE (M) SDN BHD |
MECHANICAL AND PLANT DEFECT RECTIFICATION WORKS DURING MMSB/PPMSB PLANT AND PORT STORAGE SHUTDOWN APRIL 2011 (PHASE II) |
2011 |
MTBE (M) SDN BHD |
STEAM LINE REPLACEMENT |
2011 |
MTBE (M) SDN BHD |
TIE-IN FOR PC-203AB |
2011 |
MTBE (M) SDN BHD |
BLINDING DEBLINDING FOR E-2001B AT PDH PLANT |
2011 |
MTBE (M) SDN BHD |
SPOOL FOR PPM PSV INSTALLATION |
2011 |
MTBE (M) SDN BHD |
SUPPLY OF 3”, 80, A53-B, SQ, 12M PIPE |
2011 |
MTBE (M) SDN BHD |
MTBESD0411 : VALVE TESTING |
2011 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
CAMLOCK REPAIR RATU SONGKHLA |
2011 |
MPE LINDUNG SDN BHD |
WELDING WORKS & NDT MOULD REPAIR |
2011 |
MTBE (M) SDN BHD |
REPAIR OF C-0103 NOZZLE CRACK |
2011 |
MTBE (M) SDN BHD |
FABRICATION OF PPM DUMPSTER |
2011 |
MTBE (M) SDN BHD |
TO PERFORM HPWJ CLEANING FOR IRIS EB-902 |
2011 |
MTBE (M) SDN BHD |
INSTALLATION OF FILTER PACKAGES AND INTERFACING FACILITY CONSTRUCTION FOR MTBE PLANT AND PORT STORAGE |
2011 |
MTBE (M) SDN BHD |
MECHANICAL AND PLANT DEFECT RECTIFICATION WORKS DURING MMSB/PPMSB PLANT AND PORT STORAGE SHUTDOWN APRIL 2011 |
2011 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO FABRICATE SEA CHEST STRAINER |
2011 |
ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN BHD |
HOSE TESTING REVALIDATION (001) |
2011 |
ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN BHD |
LIFTING EQUIPMENT REVALIDATION (001) |
2011 |
MTBE (M) SDN BHD |
MTBE SD0411 COOLING WATER BYPASS LINE |
2011 |
MTBE (M) SDN BHD |
FABRICATION & INSTALLATION OF F-4006 PIPING SYSTEM |
2010 |
MTBE (M) SDN BHD |
PIPING FABRICATION (EPCC FOR REPLACEMENT TURBINE METER WITH CORIOLIS AT MTBE METERING STATION) |
2010 |
NAN ACECON SDN BHD/ PETRONAS GAS BERHAD |
FABRICATION & INSTALLATION OF CUF HANDRAIL MONKEY LADDER & TRASH TRAP |
2010 |
MTBE (M) SDN BHD |
PPM PIPING REPLACEMENT (3/4”-HPN-40N01-D12A) |
2010 |
MTBE (M) SDN BHD |
FABRICATION & INSTALLATION OF MANUAL DAMPING SPOOL |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO FABRICATE SEA CHEST STRAINER |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
SUPPLY MANPOWER & EQUIPMENT FOR THE PARTIAL SHUTDOWN 2010 |
2010 |
MTBE (M) SDN BHD |
PPM TEAL LINE REPLACEMENT |
2010 |
MTBE (M) SDN BHD |
TO REPLACE PR-2”-11172-17 790 LINE AT PORT STORAGE C/W GLASSFLAKE COATING |
2010 |
SIME ENGINEERING SDN BHD |
MECHANICAL WORKS FOR SEGAMAT COMPRESSOR STATION EXPANSION PROJECT (SHUTDOWN WORK ON 29 AUGUST 2010) |
2010 |
SIME ENGINEERING SDN BHD |
PROVISION OF SUPPLY AND DELIVER MANPOWER, TOOLS, EQUIPMENTS, CONSUMABLES AND MACHINERIES FOR POST SHUTDOWN WORK ACTIVITIES FOR PIPING AND MECHANICAL WORKS AT SEGAMAT COMPRESSOR STATION EXPANSION PROJECT. |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
PRE-FABRICATION OF AIR SUPPLY LINE AT MALONG |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
PRE-FABRICATION OF SOTONG AIR SUPPLY LINE |
2010 |
SIME ENGINEERING SDN BHD |
MECHANICAL WORKS FOR SEGAMAT COMPRESSOR STATION EXPANSION PROJECT |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
LOW SEA CHEST 26” ANGLE VALVE REPLACEMENT |
2010 |
MTBE (M) SDN BHD |
RENTAL OF HPWJ FOR HEX. CLEANING AT MTBE |
2010 |
MTBE (M) SDN BHD |
D-1107, PD-1116A/B & T-1107 PTFE LINED PIPING REPLACEMENT |
2010 |
MTBE (M) SDN BHD |
EB-115 PIPING MODIFICATION |
2010 |
MTBE (M) SDN BHD |
FABRICATION & INSTALLATION OF PC-206-B COVER |
2010 |
MTBE (M) SDN BHD |
FABRICATION & INSTALLATION OF SPOOLS FOR PARTICLE SCREENING AT PPM |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
FABRICATION & INSTALLATION OF MALONG WATER INJECTION PIPING (80-WI-1458) |
2010 |
PETRONAS CARIGALI SDN BHD |
PROVISION OF CORRODED PIPING REPLACEMENT (MCI REPORT) – ONSHORE FABRICATION AT BEKOK B FOR PCSB-PMO |
2010 |
MTBE (M) SDN BHD |
FABRICATION & INSTALLATION FOR SAMPLING POINT |
2010 |
MTBE (M) SDN BHD |
HEAT EXCHANGERS, CONDENSERS & COOLER (RENTAL OF HPWJ HEX. CLEANING) |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
PERINTIS IN-SITU REFURBISHMENT PHASE 2 |
2010 |
MSET ENGINEERING CORPORATION SDN BHD |
INSTALLATION OF SEAWATER FINE FILTERS F-610A, F-610B & F-610C AT FPSO PERINTIS |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
INSTALLATION OF Y-STRAINER & BASKET STRAINER AT SOTONG PLATFORM |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
MALONG WATER INJECTION PROJECT |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
INSTALLATION OF Y-STRAINER & BASKET STRAINER AT MALONG PLATFORM |
2010 |
MTBE (M) SDN BHD |
10” PIPING MODIFICATION EB-230 |
2010 |
MTBE (M) SDN BHD |
PPM PORTABLE WATER PIPING REPLACEMENT PHASE 2 |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
PERINTIS IN-SITU REFURBISHMENT PROJECT PHASE 1 |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
INSTALLATION OF DECK PLATE ENGINE ROOM PHASE 2 |
2010 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
MALONG FUEL GAS LINE PROJECT |
2010 |
MTBE (M) SDN BHD |
HEAT EXCHANGER, BUNDLES & VESSELS INSTALLATION DURING MTBE MINI SHUTDOWN FEBRUARY 2010 |
2010 |
MTBE (M) SDN BHD |
D-105 PIPING REPLACEMENT |
2010 |
MTBE (M) SDN BHD |
FABRICATION & INSTALLATION OF S-107 COOLING COIL |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
INSTALLATION OF COW MACHINE |
2009 |
MTBE (M) SDN BHD |
PROJECT 1638 EB-0902 PIPING INSTALLATION WORKS |
2009 |
MTBE (M) SDN BHD |
FABRICATION OF NEW PPM STEAM INJECTION PIPE AT MTBE PLANT |
2009 |
MTBE (M) SDN BHD |
REPLACE 6” DEFECT SPOOL AT PORT STORAGE MTBE PLANT |
2009 |
MTBE (M) SDN BHD |
T-1708 PROPYLENE LINE REPLACEMENT PROJECT |
2009 |
MTBE (M) SDN BHD |
REPLACE 1” DEFECT PIPE AT PDH SHUTDOWN 2009 |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
FABRICATION & INSTALLATION OF 12” COW LINE REPLACEMENT |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
REPLACE BADLY CORRODED DECK PLATFORM ENGINE ROOM MAIN FLOOR |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
FABRICATION & INSTALLATION OF 2 UNITS OF TG-AIR GUIDE |
2009 |
ALLIED CALIBRATION ENGINEERING SERVICES SDN BHD |
INSTALLATION OF DRY GAS SEAL AND ITS ANCILLARIES PROJECT |
2009 |
MTBE (M) SDN BHD |
HEAT EXCHANGER (4NOS) CLEANING AT PORT STORAGE MTBE |
2009 |
MTBE (M) SDN BHD |
INSTALLATION OF NEW HEAT EXCHANGER AT PORT STORAGE MTBE |
2009 |
MTBE (M) SDN BHD |
TIE-INS POINT FOR CCR O2 ANALYZER PROJECT |
2009 |
MTBE (M) SDN BHD |
PPM PORTABLE WATER PIPING REPLACEMENT |
2009 |
MTBE (M) SDN BHD |
D1107 & T1107 PTFE LINE REPLACEMENT |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
ADDITIONAL JOB DURING SHUTDOWN AND POST SHUTDOWN |
2009 |
MTBE (M) SDN BHD |
PIPING REPLACEMENT PROJECT |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
FABRICATE & INSTALL PIPE SPOOL FOR ANDING PLATFORM |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO FABRICATE & INSTALLATION FOR COW LINE REPLACEMENT |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
INSTALLATION TF7630 TO NEW LOCATION (TRANSFER NEW TRANSFORMER) |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO FABRICATE & INSTALL PIPE SPOOLS FOR MALONG TEST SEPARATOR DRAIN LINE |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO SUPPLY MANPOWER & MATERIALS FOR JOB CODE PD13 & PD12 FOR PERINTIS ANNUAL SHUTDOWN 2009 |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
X-104 LAUNCHER REPAIR |
2009 |
MTBE (M) SDN BHD |
RES 1569 – DGS PLATFORM CONSTRUCTION |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO FABRICATE & INSTALL MALONG WATER INJECTION PIPE SPOOLS |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO REPAIR AND FABRICATE NEW DOUBLING RING SC90T2 |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO REPAIR HYDROCYCLONE LINERS |
2009 |
MTBE (M) SDN BHD |
BLINDING & DEBLINDING FOR PDH EMERGENCY SHUTDOWN 2009 |
2009 |
MTBE (M) SDN BHD |
FLANGE MACHINING FOR EB-215 |
2009 |
MTBE (M) SDN BHD |
BOLT TIGHTENING WORKS FOR PPM EMERGENCY SHUTDOWN 2009 |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
CONSTRUCTION WORK PACK CS #4.0 |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
CONSTRUCTION WORK PACK FOR SHUTDOWN 2009 – WORK PACK CS #5.0 |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO REMOVE & INSTALL 26” SEA CHEST VALVE |
2009 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
FPSO PERINTIS SHUTDOWN 2009 (FIRE WATER LINE) |
2009 |
MTBE (M) SDN BHD |
REPLACE 6” DEFECT PIPE (MTBE LINE) AT AREA 600 |
2009 |
MTBE (M) SDN BHD |
WELDING DUPLEX STAINLESS STEEL |
2009 |
MTBE (M) SDN BHD |
PPM EMERGENCY SHUTDOWN FEBRUARY 2009 |
2009 |
MTBE (M) SDN BHD |
TIE-INS WORK DURING MTBE SHUTDOWN FEBRUARY 2009 |
2009 |
MTBE (M) SDN BHD |
RECTIFICATION OF DEFECT ITEMS DURING MTBE SHUTDOWN FEBRUARY 2009 |
2009 |
MTBE (M) SDN BHD |
REPAIR OF WATER GATE VALVE INTERNAL THREAD BLOCK |
2008 |
MTBE (M) SDN BHD |
REPAIR OF D-1005 |
2008 |
MTBE (M) SDN BHD |
½” TEAL LINE REPLACEMENT |
2008 |
MTBE (M) SDN BHD |
½” & ¾” TEAL LINE DOUBLE BLOCK VALVE INSTALLATION |
2008 |
MTBE (M) SDN BHD |
2” & 3” CAUSTIC & OILER PTFE LINE REPLACEMENT |
2008 |
DONALDSON FILTRATION (MALAYSIA) SDN BHD / MTBE (M) SDN BHD |
TO SUPPLY MATERIAL, MANPOWER, EQUIPMENT AND CONSUMABLES (PIPING, CIVIL & E&I WORK) FOR INSTALLATION OF WATER CHILLER FOR WATER COMPOUNDING BATH AT PPMSB |
2008 |
MTBE (M) SDN BHD |
MMSB/ PPMSB PIPING REPLACEMENT (UTILITY WATER LINE) |
2008 |
MTBE (M) SDN BHD |
MMSB/ PPMSB PIPING REPLACEMENT (NEUTRALIZATION LINE) |
2008 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
INSTALLATION OF BOILER DECK PIPING |
2008 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO FABRICATION & INSTALLATION OF BOILER DECK PIPING |
2008 |
PETRONAS GAS BERHAD |
INSTALLATION OF METHANOL INJECTION CARBON STEEL PIPING AT GPP 5 & GPP 6 |
2008 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
CONSTRUCTION WORK FEBRUARY 2008 SHUTDOWN OFFSHORE INSTALLATION |
2008 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
CONSTRUCTION WORK FEBRUARY 2008 SHUTDOWN – FABRICATION WORK |
2008 |
MTBE (M) SDN BHD |
VARIOUS PIPING REPLACEMENT & MACHINING WORKS FOR PLANT MAINTENANCE DURING PLANT TURNAROUND 2008 |
2008 |
MTBE (M) SDN BHD |
VARIOUS RES (PIPE EXTENSION) MTBE TURNAROUND 2008 |
2008 |
MTBE (M) SDN BHD |
FABRICATION & INSTALLATION FOR T1107 DRAIN PIPING REPLACEMENT |
2008 |
MTBE (M) SDN BHD |
FABRICATION & INSTALLATION FOR CAUSTIC RETURN FROM CCR TO BATTERY LIMIT PIPING REPLACEMENT |
2007 |
FPSO VENTURES SDN BHD |
PROVISION WORK TO SUPPLY OF MANPOWER TO CARRYOUT THE MEASUREMENT AND ISOMETRIC DRAWING AS FOLLOW SCOPE OF WORK FOR FSO CENDOR |
2007 |
MTBE (M) SDN BHD |
FABRICATION & INSTALLATION FOR T1 TO T2 PIPE UPGRADING |
2007 |
MTBE (M) SDN BHD |
FABRICATION, INSTALLATION, TESTING AND COMMISSIONING FOR UTILITY WATER PIPING A520 |
2007 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
PRE-FABRICATION OF GALLEY PIPING |
2007 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
PRE-FABRICATION AND INSTALLATION OF CHAIN ROLLER AT FSO PUTERI CAKERAWALA |
2007 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
FABRICATION, INSTALLATION, TESTING AND COMMISSIONING OF PIPING AND STRUCTURE FOR FPSO PERINTIS SHUTDOWN 2007 |
2007 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
SUPPLY OF MANPOWER, EQUIPMENT, TOOLS AND CONSUMABLES FOR PERINTIS SHUTDOWN 2007 |
2007 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
SITE SURVEY & STRINGING AND PREPARATION OF NEW AND DEMOLITION DRAWING |
2007 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO SUPPLY MANPOWER, TOOLS AND CONSUMABLES TO PERFORM BLASTING & PRIMER AND PIPE BEND |
2007 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
TO PROVIDE MANPOWER, EQUIPMENT, TOOLS AND CONSUMABLES FOR FABRICATION OF PIPE SPOOLS (ONSHORE) |
2006 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
FABRICATION OF NEW P-600 DISCHARGE LINE SPOOLS FOR WATER INJECTION PIPING |
2006 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
SERVICING OF PRESSURE SAFETY RELIEF VALVE FOR DECK BOILER |
2006 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
FABRICATION OF PIPE SPOOL FOR METERING CRUDE OIL FACILITIES |
2006 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
SERVICING OF 12” GLOBE VALVE PROJECT |
2006 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
SERVICES & REPAIR OF LAUNCHER DOOR PROJECT |
2006 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
CHEMICAL CLEANING & HYDROTEST HYDRAULIC PIPING |
2006 |
M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN BHD |
FABRICATION OF 4” 6” AND 8” DELUGE PIPING SPOOLS |